This is the stone slinger filling the basement and garage with clear stone in preparation for pouring the concrete floors.
Thursday, July 15, 2010
Field Of Dreams
This is the stone slinger filling the basement and garage with clear stone in preparation for pouring the concrete floors.
Wednesday, June 9, 2010
Jake "the ferocious kitty"
This my dad, Al Burns. He is 74 years old and learned his trade in Liverpool, England following in the footsteps of his father. He re-pointed the stone foundation and removed and reset the loose and damaged brick.
The finished arch ready for a new window.
Saturday, May 29, 2010
Foundations!!
This picture is taken from the side door of the existing building. The footings are poured and Ross is placing rebar in the bench footing. It looks like Ross might have the start of a smile on his face....he's so excited about all the work we have ahead of ourselves. (written sarcastically)
Friday, May 28, 2010
We Have Permits!!
Finally, we have our permits and are a go ahead. So while we wait for the excavator to schedual us in, we had more demolition to finish. Taking down the lathe and plaster involved Ross climbing into the attic and sledge hammering it from above. It took about a half hour on each side...quick but it produced clouds of dust that billowed out the windows.This is about a third of the lathe. We spent two twelve hour days burning the stuff. It kinda looks like a beaver dam.
This is the mess inside.
And this is the schoolhouse with everything removed from the main room. The ceiling joists are 30 feet long and 9"x3". The wall studs are all pegged and notched into a 9"x9" beam that sits on a 2' thick rubble foundation wall. They don't build them like this anymore...I'm not quite sure if that is good or bad.
Sunday, May 9, 2010
Insulation Free
The majority of the plaster was removed. The window wall , a small section of the back wall and the ceiling is left to finish. We should have it done next week.
Under the maple strip flooring is 3"x
1" solid maple. It looks in great shape with tight joints.
The front section of the schoolhouse appears to have been built after the main building. The front section is double bricked unlike the main building which is only single bricked. It could be the schoolhouse was of timber construction prior to it's numerous renovations. we do know that the brick existed prior to 1897. We also found a wood strip ceiling and wood strip walls in this area.
Where's Rossco?
Hope you didn't look too long...sorry he's not there.
Thursday, April 29, 2010
A Windy Day in Hell
Monday, April 19, 2010
Swingin' Edie At Recess
Ross and I were back to the schoolhouse this weekend in demolition mode. We made good progress on the front wall. With help from the Murphy family we took down the chalkboards. They ranged between 3/8th to a 1/2 inch thick slate. We are happy that one of the chalkboards will be hanging in the Murphy's new bakery down the road.
Guess what planet that I come from? Okay...it's just a joke. I don't need any smartass answers from any of you. Believe me, all that face apparatus is necessary. The dust and plaster coats and gets inside everything.
Cleaning up the insulation and plaster is the hard part but the smashing is actually invigorating and fun until a chuck of plaster smacks you in the face or a dead bird falls out of the wall on top of you. Unfortunately, there will be plenty of deadbirds, mice and bat when we start demolishing the ceiling.
Ross looks like he's surfing in this picture but I think he's just tossing a piece
of lathe. "Hang Ten Dude" (this is for Nikki who thinks my blog is corny)This is the finished front wall. As you can see, there was a door in the centre and a window toward the right side. We are not sure when they were closed in but it happened prior to the chalkboards' installation. Some of the horizontal clapboards are 13 inches wide!!